PSA: watched a 30 year old panel swap in Denver add 90 minutes because nobody labeled the zone wires
Pulled a full rip and replace on a house in Denver last month and the old panel had 14 zone wires all the same color with zero labels, which turned what should've been a 3 hour swap into a 5 hour guessing game with a toner, so now I want to know how you all handle a takeover when the previous guy left you nothing to work with.