16
Finally finished a big install without a single callback last week
Had a 6 hour job last Tuesday over in Maplewood, running coax through two attics and a crawl space. Been doing this for about 3 years now, and this was the first time I didn't have to go back for a loose fitting or a bad termination. Made sure to double check every connector with my continuity tester before I packed up. Anybody else have that one job that just made you feel like you finally know what you're doing?
2 comments
Log in to join the discussion
Log In2 Comments
derek9926d ago
Ha, labeling cables? Whoa now, you're getting wild over there.
9
the_sandra26d ago
Made sure to double check every connector with my continuity tester" - oh look at Mr. Fancy Pants over here with his testing and preparation. Next you'll tell me you actually label your cables or something wild like that. Congrats on the clean install though, seriously. How many times did you almost throw that tester across the attic before you were done?
6