28
A project manager in Phoenix said something about concrete pours that stuck with me
Honestly, we were doing a foundation for a small office building last spring, and the PM, a guy named Carl, insisted we wait an extra 4 hours past the standard time before starting the finish work. He said, 'The mix design for this batch has a higher fly ash content, it's setting slower than you think.' Tbh, I thought he was just being overly cautious, but he was right and it saved us from a major surface defect. Has anyone else had a PM call something like that based on the specific batch ticket?
3 comments
Log in to join the discussion
Log In3 Comments
abby_chen3mo ago
Actually, that's not a batch ticket thing, that's just knowing your mix design. The ticket just confirms what was ordered versus what got delivered. Smart PMs learn how different recipes behave in the field.
4
paigeg2225d ago
I had a similar wake-up call early in my career when I blindly trusted a ticket and ended up with a load that was way too wet. Turns out the batch weights were right, but I hadn’t accounted for the high moisture in the aggregate that day. After that, I started keeping a little notebook (old school, I know) with notes on how different mixes felt and performed in the field, especially when weather changed. It’s saved me more times than I can count, and now I double-check every ticket against what I actually see in the drum.
8
Sounds like a lucky guess to me. Abby_chen has a point, it's just basic mix knowledge. Not exactly a superpower.
4