Can we talk about panelized wall systems vs stick framing on a 12,000 sq ft strip center in Tulsa?
We went panelized on the Tulsa job to save 3 weeks on the schedule and it worked, but the crane bill ate most of the savings, so I'm curious if anyone else has run that math on a similar sized building.