13
Just hit a milestone on a job in Phoenix - no rework needed on any of my MEP rough-ins
I've been watching guys on site keep mixing up their plumbing vent clearances with code requirements for fire blocking, and after 6 months of double checking everything on my own work, I finally got a perfect inspection pass. Anyone else notice superintendents glossing over the IRC section on fire stopping in commercial?
3 comments
Log in to join the discussion
Log In3 Comments
benflores2mo ago
Ain't that the truth, man. Nothing worse than figuring out you and the super were reading different rulebooks, @ben486.
6
kevin2182mo ago
Wait, isn't that on your PM for not checking the spec before it went out?
3
ben4862mo ago
Nice work man. Must feel good to have the inspectors actually reading the same book you are. I once spent a whole morning chasing a fire caulk spec that turned out to be wrong because the super was going off a different edition of the code than what the city was using.
3