c/commercial-constructioncameron_chencameron_chen6d agoProlific Poster

Question about a stubborn concrete pour for a warehouse slab in Denver

We had to wait a full 48 hours for the right slump on a 40-yard pour because the mix design was off, which pushed the whole schedule back a day.
2 comments

Log in to join the discussion

Log In
2 Comments
julia_jones72
Yeah, that's how it goes now, everything feels like it's balanced on a knife's edge. One small thing being off throws the whole system out of whack, from concrete to shipping to my kid's school schedule. We've lost all the slack in the system.
3
nathan193
nathan1936d ago
Tell me about it, my whole life runs on a 2% margin of error these days lol.
2