That vapor barrier overlap rule finally bit me on a strip mall job near Phoenix

My crew was laying out the vapor barrier under a new slab for a 12,000 sq ft retail build. I told the green kid to just tape the seams and move on. Foreman came back 2 days later and made us pull up 3 sections. Turns out I was overlapping them wrong for years. 6 inch overlap minimum, not just butted together. Cost me half a day and 4 rolls of tape. Anyone else have a basic code rule they never paid attention to until it got called out?
2 comments

Log in to join the discussion

Log In
2 Comments
the_blair
the_blair2d ago
Respectfully, inspectors in different jurisdictions often interpret the same rule differently so your mileage may vary.
6
gonzalez.vera
Buddy of mine who does commercial roofing got nailed for the same thing on a big box store roof in Tucson. He thought he was saving time by just overlapping the vapor barrier a couple inches here and there. Inspector showed up and made him redo a whole section because the overlap has to be 6 inches minimum with the tape centered. Ended up costing his company like 3 grand in labor and materials. He still gets salty about it when we grab beers.
5