Pro tip? Or bad habit: my tender box lead in Galveston thinks pre-dive checks should take 20 minutes minimum
Had a chat with my old supervisor, Dale, last week at the dock in Galveston and he insists a proper pre-dive check should never take less than 20 minutes, no matter how many times you've run the same site. I get where he's coming from with the safety side, but on a job where we're burning daylight and the client is watching the clock, that kind of slowdown gets expensive fast. Is Dale old school in the best way, or is there a middle ground where you stay thorough without killing the schedule? Curious how you all handle the pressure when a client wants you wet 5 minutes after the truck parks.