Let the load block swing free on a 40 ft pick and the tagliner got a free ride
I was setting a rooftop AC unit at a job in Tulsa and got lazy with the tag line, so the block started spinning like a top about 30 ft up. The tagliner grabbed it anyway and did a full 360 before we got him stopped, and now he won't stand within 15 ft of me on windy days. Do you guys run two tag lines on square loads or just eat the spin?