6
I finally hit my 500th revision mark on a single project
Two weeks ago I opened up my CAD file for a commercial HVAC duct layout I've been tweaking since January. Hit save and noticed the revision history showed version 503. I honestly laughed out loud. That's 503 times I went back and moved a duct run or adjusted a hanger location. Most of those were tiny shifts, like 3/8 of an inch to clear a beam. But a few were full do-overs because the structural engineer changed a column placement. I think that number matters because it shows how much guesswork gets baked into a finished set of drawings. Nobody sees the 500 tries, they just see the final run that works. Has anyone else kept track of their revision count on a big job? I'm curious if I'm the only one obsessed with getting it perfect.
2 comments
Log in to join the discussion
Log In2 Comments
ryanj6027d ago
Did you ever track how many of those revisions were actually from your own tweaks vs how many came from other trades or structural changes? I bet the number gets real different when you break it out like that. On my last big duct job I had to redo a whole plenum section three times because the electrical contractor kept shifting his cable trays. Each time it was like 2 inches here, 4 inches there, but it threw off all my offsets. Probably had 70+ saves just from chasing his moves alone.
4
wendygrant26d ago
@ryanj60 thats a good point, did you ever add up how many of your own revisions were stuff like tweaking a transition or fixing a measurement vs just chasing other trades? On a high rise I did last year, I swear 80% of my changes were because the sprinkler guys kept rerouting their mains. Would love to know if your ratio was anywhere near that bad lol.
9