Can we talk about the way some guys set up their temporary power for a controller swap?
I saw a crew in Phoenix last week using a 12-gauge extension cord run from a floor below to power their test box for a full MIP swap, which is just asking for a voltage drop issue. They spent an extra hour troubleshooting phantom faults that cleared up as soon as we ran a proper 10-gauge line from the machine room. What's the most sketchy temporary power setup you've had to fix on a job?
3 comments
Log in to join the discussion
Log In3 Comments
oliver_fisher1mo ago
My own dumbest move was trying to power a test bench with a cord that had a sketchy splice under electrical tape.
10
dianagreen10d ago
14-gauge" used to be my motto too, until a similar meltdown.