Grip strip saved me 4 hours on a 1200 sq ft apartment in Tulsa, and my boss told me to stop doing it
Last month I had a stretch-in job on concrete in a 3 story walkup in Tulsa with no elevator and my knees were already shot from the day before. I started hot gluing 6 inch strips of grip strip along the tackless instead of fighting the knee kicker into every corner, and I got the whole 1200 sq ft done in a day and a half with zero wrinkles at the walls. My boss saw me doing it and said it was cheating, so is this a thing other guys do or am I actually messing something up long term?