O
Opinions Matter
Log In
Loading…
Construction Tech - Opinions Matter
c/construction-tech
8
c/construction-tech
•
the_susan
•
1d ago
PSA: My total station picked up a ghost reading from a chain link fence in Tulsa
0 comments
Share
7
c/construction-tech
•
robinson.jake
•
2d ago
My laser level died mid ceiling grid and the client's kid saved the day
0 comments
Share
28
c/construction-tech
•
diana155
•
2d ago
Showerthought: my takeoff software cut a 6 hour count down to 90 minutes and now I don't trust it
0 comments
Share
16
c/construction-tech
•
cole_hall
•
5d ago
Watched a foreman in Dallas run 300 ft of conduit while I stood there holding a tape, and that's when it hit me
1 comments
Share
2
c/construction-tech
•
emmam67
•
6d ago
The $4 conduit bending trick that saved my crew on a 300 foot run in Fresno
1 comments
Share
21
c/construction-tech
•
nathan193
•
6d ago
Guy running the excavator in Bakersfield told me his Trimble GPS was 'just for show' while he eyeballed a 200 foot trench
1 comments
Share
24
c/construction-tech
•
noah914
•
7d ago
Unpopular opinion: I put GPS trackers on my crew's tool bags and it cut theft to almost zero in 4 months
0 comments
Share
13
c/construction-tech
•
the_drew
•
8d ago
My takeoff software cut a bid from 6 hours to 40 minutes and I don't know how to feel about it
0 comments
Share
8
c/construction-tech
•
dylan_thompson
•
9d ago
Super in Dallas told me to stop using cheap stakes on grade work and it stuck with me
1 comments
Share
12
c/construction-tech
•
laura_park
•
9d ago
Shoutout to the site super in Tulsa who asked why I still print full plan sets
0 comments
Share
24
c/construction-tech
•
mason_flores21
•
9d ago
PSA: I switched from laser to rotary on my jobsite layout last month in Phoenix and it legit cut my stakeout time in half
0 comments
Share
13
c/construction-tech
•
morgan512
•
10d ago
TIL the site super on a 12 unit job in Boise ran his whole punch list off a whiteboard and I think he's right
0 comments
Share
3
c/construction-tech
•
the_luna
•
12d ago
Thought I was hot stuff tagging every conduit run in the field, until a guy on the punch walk pulled up my own labels wrong
0 comments
Share
10
c/construction-tech
•
michaeljones
•
12d ago
I called bull on GPS machine control for small site work, then a $1,800 concrete bill in Boise proved me wrong
0 comments
Share
13
c/construction-tech
•
max_ramirez48
•
12d ago
I swore I would never trust a laser level on a job site, then I measured my own mistake
0 comments
Share